Employer:
Belgrade Land Development Public Agency
Contractor consortium:
PORR Technobau und Umwelt AG
SCT dd.
DSD Bruckenbau GmbH
www.savabridge.com
Supervision of structural works: foundation, bridge structure (concrete, steel, welding, cable stays installation), surveying.
Supervision works: 2009-2011.
Project Manager
and Engineer (PME):
The Louis Berger Group of Washington, USA and Paris, France
Bridge Works
Supervision Consultant:
Institute Kirilo Savic, Belgrade
Supervision subcontractor:
DEL ING d.o.o., Belgrade
Structural system: | cable stayed bridge with one pylon | Spans: | 50+200+376+70+108+80+80 m | |
Girder: | concrete and steel | Width: | 45 m | |
Pylon: | concrete | Pylon height: | 175+25 = 200 m |