Client:
Social Fund for real states, Stara Pazova
Designer:
DEL ING d.o.o., Belgrade,
(ex Delfin Inženjering d.o.o.)
Design check (revision):
Centroprojekt d.o.o., Belgrade
The Bridge is located at Stari Banovci, small town, 20 km from the Belgrade. The construction of the bridge solved the problem of pedestrians crossing over the Budovar Canal. In addition to the requirements of the design task the extremely limiting factor were the Client funds. This problem is solved with light weight steel structure, of unusual forms, and rigid enough to meet the requirements of serviceability for pedestrian bridge. The total bridge span is 30m, width 4,0 m. Width of the concrete carriageway slab is 3,0 m.
Responsible designer of the bridge structure:
Dipl.Ing. Aleksandar Bojović,
Designers:
Dipl.Ing. Dimitrije Aleksić(steel structure)
Dipl.Ing. Miloš Erić.
(founding)
Detailed design: Technical Report , Structural Analysis, Bill of Quantities, Cost Estimate, Drawings of the Bridge steel structure – disposition and characteristic elements of the structure and drawings of the Foundation concrete structures.
Steel quantity S235: | 17,5 t | Detailed design: | 2001. | |
Construction - Montena d.o.o. Belgrade: | 2002. | |||
Opening ceremony: | 2003. |